These Design Guidelines are intended to guide the Design Team as they proceed with the work of their Project. Each member of the Design Team shall review the entire contents of these Design Guidelines and assure that their work complies in every way with these guidelines established by Case Western Reserve University. Click on a topic for more information.
- Design Guidelines (full document)
- Table of Contents
- Division 00 - Procurement and Contracting Requirements
- Division 01 - General Requirements
- Division 02 - Existing Conditions
- Division 03 - Concrete; pending
- Division 04 - Masonry; pending
- Division 05 - Metals; pending
- Division 06 - Wood, Plastics, and Composites
- Division 07 - Thermal and Moisture Protection
- Division 08 - Openings
- Division 09 - Finishes
- Division 10 - Specialties
- Division 11 - Equipment; pending
- Division 12 - Furnishings; pending
- Division 13 - Special Construction
- Division 14 - Conveying Equipment
- Division 21 - Fire Suppression
- Division 22 - Plumbing
- Division 23 - Heating, Ventilating, and Air Conditioning
- Division 25 - Integrated Automation; pending
- Division 26 - Electrical
- Division 27 - Technology
- Division 28 - Electronic Safety and Security
- Division 31 - Earthwork; pending
- Division 32 - Exterior Improvements
- Division 33 - Utilities