Location: Ground Floor, Robbins Building
Client: School of Medicine, School of Dental Medicine
Schedule:
- Design: February 2023 - April 2024
- Construction: May 2024 - July 2025
- Beneficial Occupancy Date (BOD): 7.2.25
Financials:
- Budget: $8M
- Total project cost: $7.3M
Scope of Project: This two-phased project consolidated the gross anatomy teaching spaces on the ground floor of the Robbins Building. To enable continued use of the space, half of the project’s footprint (Phase 1) was fully completed and occupied before starting the second half (Phase 2). The work required a complete renovation of current space as most of the building systems, finishes, and equipment are original to the 1967 construction. While providing critically needed teaching space to both the School of Medicine and the School of Dental Medicine, this project will also enable future projects on the 3rd floor of Robbins.